Positions tested against a common standard
Services

Construction dispute services, from expert evidence to adjudication.

Each instruction is scoped in writing before work begins, with the role, the questions to be answered and the limits of the opinion stated at the outset.

01

Expert Witness

Independent written and oral evidence on quantum, defects, valuation and professional negligence for litigation, arbitration and adjudication.

  • Party-appointed expert
  • Single Joint Expert
  • Expert adviser (shadow expert)
  • Joint statements & meetings of experts
02

Defects & Survey Disputes

Causation and remedy of building defects, water ingress and workmanship failures, and what a survey or inspection should have found.

  • Defect inspection & causation
  • What a survey should have found
  • Neighbour & adjoining-owner disputes
  • Remedial scope & cost
03

Dispute Resolution

Analysis that gets to the number: what was owed, what was paid, what it will cost to put right and what the evidence supports.

  • Final account & payment disputes
  • Interim applications & notices
  • Overpayment & true value
  • Professional negligence support
04

ADR

Alternative dispute resolution support that helps parties settle on an informed basis, before the costs of formal proceedings take hold.

  • Expert determination
  • Early neutral evaluation
  • Mediation support & position papers
  • Without-prejudice reviews
05

Adjudication

Quantum evidence, notice analysis and drafting support for referring and responding parties under the Construction Act.

  • Referral & response drafting support
  • Quantum evidence for adjudication
  • Smash-and-grab & true-value analysis
  • TCC enforcement support
Approach

Different positions. One standard of measurement.

The Baker Accordia mark is two offset strokes referenced to a single datum. Parties to a dispute rarely agree, but their positions can be tested against the same contract, the same records and the same professional standard. That is what an independent expert is for.

I

Independent

The overriding duty is to the tribunal, not to the instructing party. Conflicts are checked before acceptance and declared in the report.

II

Evidence-led

Opinions are built from the contract, the records and site evidence. Facts are separated from opinion, and assumptions are listed where records run out.

III

Proportionate

Scope is matched to the value and complexity of the dispute. Whole-account or sampled testing is agreed in advance so costs stay predictable.

IV

Clear

Reports are written to be read by lawyers and decision-makers, not just surveyors: short conclusions, numbered findings and schedules that can be checked.

Recent commissions

Instructions across court, adjudication and pre-action work.

Anonymised to protect confidentiality. The full appointment history is set out in the expert CV, available to instructing solicitors on request.

YearForumMatterRole
2026Adjudication (Construction Act)Alleged overpayment on a two-dwelling residential scheme under a JCT Prime Cost contract; whole-account reconciliation of applications, certificates, bank receipts and source records.Independent QS report for the responding party, instructed by solicitors
2026County Court (pre-issue)Water ingress to a terraced house attributed to adjoining-owner defects; inspection with moisture testing and drone survey; causation and party-structure evidence.CPR Part 35 report, instructed by solicitors
2026Pre-actionPost-extension defects to a rural bungalow: render failure, roof and balcony junctions, drainage; scope and reasonable cost of remedial works.Expert adviser report for homeowners, CPR 35 structure
2026Crown CourtDisputed value of building works following a guilty plea; valuation evidence for sentencing.Expert report, instructed by the prosecuting authority
See all recent commissions
Forums, contracts and standards

Where the work is done, and the rules it is done to.

Forums

  • Technology and Construction Court
  • County Court (fast and multi-track)
  • Crown Court (prosecution instruction)
  • Arbitration (CIArb, LCIA, ICC rules)
  • Adjudication (Scheme, TeCSA, RICS, CIArb)
  • Mediation and expert determination

Contract forms

  • JCT Minor Works, Intermediate, Standard, Design and Build
  • JCT Prime Cost and Home Owner contracts
  • NEC3 and NEC4 ECC and ECS
  • FIDIC (international instructions)
  • Bespoke and letter-of-intent arrangements
  • Informal and oral residential contracts

Standards

  • CPR Part 35 and Practice Direction 35
  • CJC Guidance for the Instruction of Experts
  • RICS Surveyors acting as expert witnesses
  • RICS Rules of Conduct
  • Pre-Action Protocol for Construction and Engineering Disputes
  • Housing Grants, Construction and Regeneration Act 1996 and the Scheme

Dispute types

  • Final account and valuation
  • Interim payment and notices
  • Overpayment and true value
  • Building defects and water ingress
  • Neighbour and adjoining-owner disputes
  • Professional negligence of surveyors, QS and contract administrators
A bound report with a navy cover on a desk beside a brass rule and a construction drawing
How an instruction works

From first call to signed report.

A clear process keeps the appointment defensible and the timetable realistic, whether the instruction comes from a solicitor, a barrister, a contractor or a private client.

  1. Conflict check and initial callA short, no-cost conversation to understand the dispute, the forum and the questions the expert is being asked to answer.
  2. Written terms and scopeRole, questions, documents required, fee basis and timetable are confirmed in writing before work begins.
  3. Review and analysisContract, records, applications, valuations and site evidence reviewed; findings tested and schedules built so they can be followed.
  4. Report, joint statement and hearingCPR 35-compliant report with Statement of Truth, followed by meetings of experts and oral evidence where required.
Read the full approach
Christopher Baker MRICS MRPSA, Chartered Quantity Surveyor and Director of Baker Accordia
About

Christopher Baker MRICS MRPSA

Christopher is a Chartered Quantity Surveyor and Director of Baker Accordia, a trading name of ClystCore Ltd, a RICS-regulated practice based in Exeter, with wide experience across quantum, building defects, payment and professional negligence. His dispute work draws on day-to-day experience of tendering, valuation of works, payment administration and contract administration on construction projects, and on inspecting and reporting on residential buildings under the RICS Home Survey Standard. The opinions he gives are grounded in how buildings are actually built, priced, paid for and recorded.

He acts as party-appointed expert, Single Joint Expert and expert adviser on quantum, building defects, payment and professional negligence matters, reporting to Civil Procedure Rules Part 35, Criminal Procedure Rules Part 19 and the RICS practice statement for surveyors acting as expert witnesses.

ProfessionalMRICS, Chartered Quantity Surveyor
StandardsCPR Part 35 · CrimPR Part 19 · RICS Surveyors acting as expert witnesses
BasedWinslade Park, Exeter · instructions across the UK
Full profile and CV
Contact

Discuss an instruction in confidence.

Early conversations are without obligation and treated as confidential. Conflicts are checked before any detail of the dispute is discussed.

Telephone
0330 520 0523
Email
enquiries@bakeraccordia.co.uk
Office
Brook House, Winslade Park
Exeter EX5 1GD
Hours
Monday to Friday, 9.00 to 17.30
Instructions
England and Wales; other jurisdictions by arrangement