Surveyor professional negligence: what an independent expert looks at

Claims against surveyors arise when a certificate overpaid a contractor, a cost plan proved badly wrong, or a home survey missed a serious defect. In each case the court needs an independent surveyor from the same discipline to explain what a reasonably competent professional would have done. Here is how that assessment works.

The standard of care

The law does not expect a surveyor to be perfect. The question is whether they fell below the standard of a reasonably competent member of their profession, exercising the skill they held themselves out as having. A surveyor who followed a practice accepted as proper by a responsible body of their peers will not usually be negligent just because others would have done it differently, provided that practice stands up to logical analysis.

That is why expert evidence is essential. The judge needs an independent surveyor with experience of the same type of work to explain what competent practice looked like at the time, and how the work in question compares.

Typical claims against quantity surveyors and contract administrators

  • Over-certification. Interim certificates valuing work above what was done, leaving the employer exposed if the contractor fails.
  • Missed notices. Failing to issue payment or pay less notices on time, so the employer loses the right to dispute a sum.
  • Cost advice. Cost plans or estimates that were wrong for reasons a competent QS should have identified.
  • Final accounts. Agreeing variations or loss and expense without proper substantiation.
  • Procurement and contract advice. Recommending a contract form or amendments that did not protect the client as instructed.

Typical claims against residential surveyors

  • A defect that should have been seen and reported at the survey level bought.
  • A condition rating no competent surveyor would have given on the evidence.
  • A missing recommendation for further investigation.

We cover home survey claims in more detail in what a home survey should have found. Where a valuation is criticised, the valuation opinion is given by a RICS Registered Valuer, and the court will consider whether the figure fell outside the range a competent valuer could have reached.

How the expert approaches the assessment

  • The retainer. What was the surveyor appointed to do? The terms of engagement, the scope of services and any later instructions define the duty.
  • The standards at the time. The RICS standards, guidance and accepted practice that applied when the work was done, not those in force today.
  • The information available. What the surveyor knew, or should have found out, at the time. Hindsight is the most common trap in these cases.
  • What was done. The surveyor's file: notes, measurements, photographs, valuations, correspondence and reports.
  • The comparison. Whether a reasonably competent surveyor, with the same information, could have done what this surveyor did. Where competent surveyors could differ, the report says so.

Whether there was negligence is a legal question for the court. The expert gives the technical comparison that the court needs to decide it.

Loss and causation

Showing a breach is only half the claim. The claimant must also show what loss it caused, and that the loss falls within the scope of the surveyor's duty. For a negligent home survey, damages are usually the difference between the price paid and the true value of the property with the defect known, with modest damages for distress and inconvenience in some cases. For a negligent QS, the loss might be the overpayment that cannot be recovered from an insolvent contractor, or the sums lost through a missed notice. The quantity surveying evidence often does double duty here, measuring both the breach and the loss.

Limitation

Time limits are strict. As a general guide, a claim in contract must normally be brought within six years of the breach. A claim in negligence must normally be brought within six years of the damage, or, for latent damage, three years from when the claimant knew or should have known the relevant facts, subject to a 15-year longstop from the negligent act. Anyone considering a claim should take legal advice early.

The pre-action protocols

A short preliminary expert view before the letter of claim is sent can save a great deal of cost, either by confirming the claim is worth pursuing or by showing it is not.

How Baker Accordia can help

Chris Baker MRICS has many years of quantity surveying, cost management and contract administration experience in residential and commercial construction. He gives independent expert evidence on whether surveying and contract administration work met the standard of a reasonably competent surveyor, and on the resulting loss. See also our defects and survey disputes service. Contact us to discuss a matter.

This article is general information, not legal advice.

How this applies to your matter. The points above are general. Whether they help in a particular dispute depends on the contract wording, the notices actually served and the records available. Send the parties and project for a conflict check and Chris will tell you whether a quantity surveying opinion would assist.
Christopher Baker MRICS MRPSAChartered Quantity Surveyor and expert witness. Director, Baker Accordia, a trading name of ClystCore Ltd. Profile

This article is general information for professionals and the public, not legal or professional advice, and does not create a client relationship. The law and procedure described are those of England and Wales as understood at the date of publication. Take advice on your own facts before acting.