Disputes with a builder: when a homeowner needs a quantity surveyor
An extension that leaks, a final bill far above the quote, a builder who walks off site. Most homeowner disputes come down to two questions: was the work done properly, and what is it worth? An independent quantity surveyor can answer both, and the answer often decides whether the dispute settles or goes to court.
The common types of dispute
Homeowner disputes with builders tend to fall into a few patterns, often several at once:
- Defects. Work that leaks, cracks, fails building control or does not match the drawings.
- Overcharging. A final account well above the quote, with extras the homeowner did not agree or does not understand.
- Overpayment. Stage payments made ahead of progress, so the homeowner has paid for more than has been built.
- An unfinished job. The builder leaves site, or is asked to leave, and someone else has to complete it.
- Delay. The work overran and the homeowner has paid for extra rent, storage or alternative accommodation.
Your rights as a consumer
Where a builder contracts with a consumer, the Consumer Rights Act 2015 implies a term that the service will be performed with reasonable care and skill. What the builder told you about the work can also be binding, and if no time was agreed the work must be done within a reasonable time.
If the work falls short, the Act gives the homeowner the right to require the builder to redo the defective work within a reasonable time and without significant inconvenience. If that is impossible, or the builder does not do it properly, the homeowner can claim an appropriate price reduction, which can be up to the full price. The homeowner may also have a claim for damages under the general law of contract.
Whether the work was done with reasonable care and skill, and what a fair price reduction would be, are largely technical and valuation questions. That is where expert evidence comes in.
Why adjudication usually does not apply
Statutory adjudication under the Housing Grants, Construction and Regeneration Act 1996 gives most construction parties a quick route to a binding decision. But Part II of the Act does not apply to a contract with a residential occupier for work on the home they live in or intend to live in. Some homeowner contracts, including some JCT forms, contain their own adjudication clause, so it is always worth checking the contract. Otherwise, the options are negotiation, mediation, an industry or trade body scheme if the builder belongs to one, or court proceedings.
The pre-action stage
Before issuing a claim, the parties are expected to follow the Pre-Action Protocol for Construction and Engineering Disputes. The homeowner sends a letter of claim setting out the complaint and the sums claimed, and the builder should respond within 28 days. The parties should then normally meet to try to resolve or narrow the issues. A short, clear expert assessment at this stage often makes the letter of claim far more effective, because it shows the builder exactly what is wrong and how the figures are built up.
Court tracks and proportionate evidence
If the dispute goes to court, the value of the claim decides the track, and that affects how much expert evidence is allowed and what costs can be recovered:
- Small claims track: most claims up to £10,000. Recoverable expert fees are capped at £750 per expert.
- Fast track: claims up to £25,000.
- Intermediate track: claims over £25,000 and up to £100,000 that meet the criteria.
- Multi-track: larger or more complex claims.
On the lower tracks the court will often direct a single joint expert, instructed by both parties, to keep costs proportionate. See expert witness fees and timescales for more on costs.
What an independent quantity surveyor does
A quantity surveyor measures and values construction work. In a homeowner dispute, that means:
- Valuing the work actually done, against the contract price and any agreed variations, so you know whether you have paid too much.
- Testing the final account, separating genuine variations from work that was always in the contract, and checking the rates charged.
- Identifying and costing defects, with a measured remedial scope priced at current rates rather than relying on one contractor's quote.
- Pricing completion, if the builder has left, so the extra cost of finishing the job is properly evidenced.
- Separating betterment, so the claim does not include improvements the homeowner would have paid for anyway.
Where the cause of a defect is structural, a structural engineer may also be needed. The quantity surveyor can coordinate with them so the costed scope matches the diagnosis.
Practical steps for homeowners
- Keep the quote, contract, drawings, specification, every invoice and proof of payment.
- Keep messages and emails with the builder, especially about extras and price changes.
- Photograph the work as it stands, with dates, before anything is repaired or covered up.
- Put complaints in writing and give the builder a reasonable chance to put things right.
- Do not withhold large sums without advice; the contract terms on payment matter.
- Get advice before a new builder starts, so the evidence of the original work is recorded first.
How Baker Accordia can help
We act for homeowners, contractors and their solicitors, as a party-appointed expert or a single joint expert, and give independent advisory reports before proceedings. Contact us to talk through your dispute.
This article is general information, not legal advice. For advice on your rights and options, speak to a solicitor.
This article is general information for professionals and the public, not legal or professional advice, and does not create a client relationship. The law and procedure described are those of England and Wales as understood at the date of publication. Take advice on your own facts before acting.